合同 CONTRACT
日期: 合同号码:
Date: Contract No.:
买 方: (The Buyers) 卖方: (The Sellers)
兹经买卖双方同意按照以下条款由买方购进,卖方售出以下商品:
This contract is made by and between the Buyers and the Sellers; whereby the Buyers agree to buy and the Sellers agree to sell the under-mentioned goods subject to the terms and conditions as stipulated hereinafter:
(1) 商品名称:
Name of Commodity:
(2) 数 量:
Quantity:
(3) 单 价:
Unit price:
(4) 总 值:
Total Value:
(5) 包 装:
Packing:
(6) 生产国别:
Country of Origin :
(7) 支付条款:
Terms of Payment:
(8) 保 险:
Insurance:
(9) 装运期限:
Time of Shipment:
(10) 起 运 港:
Port of Lading:
(11) 目 的 港:
Port of Destination:
(12)索赔:在货到目的口岸45天内如发现货物品质,规格和数量与合同不符,除属保险公司或船方责任外,买方有权凭中国商检出具的检验证书或有关文件向卖方索赔换货或赔款。
Claims:
Within 45 days after the arrival of the goods at the destination, should the quality, Specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owners of the vessel are liable. The Buyers shall, have the right on the strength of the inspection certificate issued by the C.C.I.C and the relative documents to claim for compensation to the Sellers.
(13)不可抗力:由于人力不可抗力的原由,发生在制造、装载或运输的过程中导致卖方延期交货或不能交货者,卖方可免除责任。在不可抗力发生后,卖方须立即电告买方及在14天内以空邮方式向买方提供事故发生的证明文件,在上述情况下,卖方仍须负责采取措施尽快发货。
Force Majeure:
The sellers shall not be held responsible for the delay in shipment or non-deli-very of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading or transit. The sellers shall advise the Buyers immediately of the occurrence mentioned above the within fourteen days there after. The Sellers shall send by airmail to the Buyers for their acceptance certificate of the accident. Under such circumstances the Sellers, however, are still under the obligation to take all necessary measures to hasten the delivery of the goods.
(14)仲裁:凡有关执行合同所发生的一切争议应通过友好协商解决,如协商不能解决,则将分歧提交中国国际贸易促进委员会按有关仲裁程序进行仲裁,仲裁将是终局的,双方均受其约束,仲裁费用由败诉方承担。
Arbitration:
All disputes in connection with the execution of this Contract shall be settled friendly through negotiation. In case no settlement can be reached, the case then may be submitted for arbitration to the Arbitration Commission of the China Council for the Promotion of International Trade in accordance with the Provisional Rules of Procedure promulgated by the said Arbitration Commission. The Arbitration committee shall be final and binding upon both parties. And the Arbitration fee shall be borne by the losing parties.
买方: 卖方:
(授权签字) (授权签字)
相关知识推荐
中英文合同条款是怎样
中英文合同条款往往是合同当事人一方是外国人,或者是合同存在其他涉外因素,为方便当事人对合同条款的理解
237人咨询过
英文合同的结构与主要条款
标准英文合同通常可以分为前言(Preamble)、正文(Habendum)、证明部分(Attesta
如何阅读英文合同(4)
4.英文合约的结构一份完整的英文合约通常可以分为标题、序文、主文条款及结尾辞四大部份。「标题」在开宗
234人咨询过
英语合同样本
TIMBERSALECONTRACT-SAMPLEThefollowingdocumentoffer
216人咨询过
308人咨询过
247613人咨询过
847人咨询过
施工合同是不是要式合同
施工合同是要式合同。所谓要式合同是指根据法律规定应当采取特定方式订立的合同。施工合同是指承包人进行工
施工合同诉讼有效期
施工合同诉讼有效期一般是3年,特殊情况从其规定。向人民法院请求保护民事权利的诉讼时效为3年,自权利被
施工合同几年没有诉讼时效
施工合同三年超过诉讼时效。向人民法院请求保护民事权利的诉讼时效是三年,从权利被侵害之日起超过二十年的
建设合同属于什么类别合同
建设合同属于承揽类别合同。建设工程合同是承包人进行工程建设发包人支付价款的合同,通常包括建设工程勘察
承揽合同纠纷是什么意思
承揽合同纠纷是在承揽人按照定作人的要求完成工作、交付工作成果,定作人给付报酬的过程中发生的纠纷,如报
先施工后签合同违法吗
先施工后签合同违法,存在一定的法律风险。对于合同签订前的履行过程,由于存在较大的不确定因素,双方的权